A small business website usually takes somewhere between one and five weeks to build once the scope is agreed, depending on how many pages it has and how quickly content and feedback arrive. At Ortha, our published ranges, counted from an approved quote to launch, are 1 to 2 weeks for a one-page launch page, 2 to 4 weeks for a starter website of up to 5 pages, and 3 to 5 weeks for a business website of up to 8 pages with a blog or news section. A first version of custom software, such as a client portal, takes 10 to 12 weeks.
Those numbers assume the client has copy, photos and decisions ready when they're needed. When a project runs past its range, the usual cause is waiting on content or feedback. The rest of this guide covers where the time goes, what slows a site down, and how to start so the calendar holds.
Typical timelines by project type
These are the ranges on our pricing page and process page. Each one comes from a fixed scope, so it describes a specific kind of project.
Project | What it is | Typical time from approved quote |
|---|---|---|
Launch page | One page, up to 6 sections, contact form | 1 to 2 weeks |
Starter website | Up to 5 pages, simple CMS, redirects and handover | 2 to 4 weeks |
Business website | Up to 8 pages plus a blog, news or projects section | 3 to 5 weeks |
Custom software | Sign-in, one core workflow, admin area | 10 to 12 weeks |
AI feature | One assistant or automation added to a site or tool | 1 to 3 weeks |
Your written quote states the exact timeline for your project. If you add pages, features or a second language, the quote changes, and so does the date.
We don't publish an "industry average," and we'd be wary of anyone who does. A five-page brochure site and a site with bookings, payments and 200 product pages are both "a website," and averaging them tells you nothing about yours.
Where the weeks go
Every website build we run moves through the same five stages: talk, design, build, launch and support. Knowing what happens in each one makes the timeline easier to plan around.
Talk: brief and scope
This stage is a short call or a few emails about your business, your customers and what the site needs to do. You get back a written scope, a fixed price and a timeline. The clock in the table above starts when you approve that quote, so the speed of this stage is mostly up to you.
Design: structure first, then the look
Page plans and wireframes settle what goes on each page and in what order. Full designs for phone and desktop follow. You review each stage before the next one starts, which is where most of your time goes as an owner. A review that takes a day keeps the project moving. A review that sits for two weeks adds two weeks.
Build: a live link to click through
The site is built and tested on phones, tablets and desktops. You get a live preview link early, so you can click through the real thing while it comes together. We need a click through the preview, access to any tools we're connecting to, and sign-off on the final content.
Launch: live on your domain
The site goes live on your domain, every link and form is checked, and old pages are redirected to their new addresses. If you're replacing an existing site, those redirects matter for search. Google's own guide to site moves with URL changes recommends mapping old URLs to new ones with permanent redirects, and that mapping takes time to do properly on a site with lots of pages. Launch also needs access to your domain and hosting, which is a common, avoidable delay when nobody remembers who has the login.
Support: after launch
Fixes, updates and new pages go to the same people who built the site. Support has no fixed length. It runs for as long as you want help with the site.
What slows a website build down
When a project runs late, it's almost always one of these:
- Copy that isn't written yet. Writing the words for a whole site is often the slowest part of the project for an owner. If you'd like us to write it, copywriting is $125 per page as an add-on, and it's better to decide that at the start than halfway through.
- Photos and logos that live in someone's inbox. Gathering brand files, team photos and product shots can take longer than designing the pages they go on.
- Slow or scattered feedback. Five people replying separately, a week apart, will stretch any calendar. One person collecting feedback and sending one list works much better.
- Scope that grows mid-project. A new page or a booking system added halfway through is quoted first, and it moves the date.
- Domain and hosting access. If the domain was registered years ago by a former employee or an old agency, finding the account can hold up launch. Our post on whether you own your website domain explains how to check.
- A migration. Moving content from an old site and keeping old links working adds a step. Our website migration checklist covers that work in detail.
A tight launch date can sometimes be met by putting more of the team on the project at once. That's a pricing factor, so it belongs in the written quote.
DIY builders vs hiring a studio
Wix and Squarespace can put a template site online quickly. What a builder speeds up is the design and setup. It doesn't write your copy, pick your photos or decide what each page should say, and those jobs take the same time whether you use a builder or a studio. If you're doing it yourself on evenings and weekends, the honest timeline is however long those jobs take you.
A studio timeline costs more money and less of your time. You still have to supply content and decisions, but the planning, design, build, testing, redirects and launch are someone else's job. If you're comparing platforms first, our guide to WordPress vs a custom website covers that decision.
Launch page or a full site?
If you need something online fast, for a new offer, an event or a business that's opening next month, a launch page is the quickest route. At Ortha it starts from $500 and typically takes 1 to 2 weeks. It's a single page with up to 6 sections, a contact form that emails you, and SEO basics.
A launch page can grow into a full site later. You can add pages, a blog or news section, or a care plan once it's live, and you work with the same people each time. For a business that needs to be found in search for several services, a starter website from $1,250 or a business website from $2,000 is usually the better starting point, because each service gets its own page.
How much of your time it takes
Expect to be most involved at the start and at each review: a kick-off call, feedback on the page plan and designs, and a look at the live preview. We tell you up front when we'll need you, so you can plan around it. Between reviews, there's not much for you to do.
If you're writing your own copy, add the time that takes. For a five-page site, that's often the biggest chunk of owner time in the whole project.
How to start so the clock runs cleanly
You can take weeks off a project before it begins:
- Write down what the site has to do. More calls, more bookings, fewer "what do you charge?" emails. One sentence each is enough.
- Collect what you already have: logo files, brand colors, photos, any existing copy worth keeping.
- List sites you like and ones you don't, with a line on why.
- Find your domain and hosting logins now, not on launch day.
- Pick one person to give feedback and sign off.
- Know your deadline and tell the studio on the first call.
Then send us a few lines about the project or book a free 30-minute call from the same page. You'll get a written scope, a fixed price and a realistic date before any work starts. You can see the full range of what we build on our websites service page.
FAQ
How long does it take to build a small business website?
At Ortha, a starter website of up to 5 pages typically takes 2 to 4 weeks from an approved quote, and a business website of up to 8 pages takes 3 to 5 weeks. Content and feedback arriving on time keep those dates.
What is the fastest way to get a website live?
A one-page launch page. Ortha's starts from $500 and typically takes 1 to 2 weeks, and it can grow into a full site later.
Why do website projects take longer than quoted?
Usually because copy, photos, feedback or domain access arrive late, or because new pages and features are added mid-project. Added scope is quoted first and moves the date.
How long does it take to build a website on Wix or Squarespace?
A builder can put a template online quickly, but you still have to write the copy, choose photos and decide what each page says. Those jobs take most of the time, whichever tool you use.
How long does custom software take to build?
A first version of a simple tool, client portal or dashboard typically takes 10 to 12 weeks at Ortha, from an approved quote.